Welcome Page
Qweak
Region 3 Drift Chambers
Construction
Software
DAQ
Internal
Physics
Weekly Meeting
Development and Construction related Topics, Page 1 of 37
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
738 Entries
Goto page 1,
2
,
3
...
35
,
36
,
37
Next
Id
Record date
Author
Type
Category
Subject
Text
743
11/12/2009 4:26:25 PM
John Leckey
General
Leia Analysis
1567 Data with New Map
Here is the latest analysis from the benchmark
file from Leia with the major difference
being that the map used to analize the file
8x
742
11/12/2009 1:37:29 PM
David Armstrong
Other
Cables
Cabling and Power Supply needs in Hall C
Here is a first draft of a memo to Bill
Vulcan outlining what
741
11/5/2009 10:36:53 PM
John Leckey
General
Chamber Testing
Newest Analysis
Here is the newest analysis in pdf form.
740
10/6/2009 1:11:45 PM
John Leckey
General
Chamber Testing
Leia Eff vs Voltage
Here is an efficiency plateau curve
for Leia as a function of voltage. Each
efficiency is 7 wire efficiency and is
739
10/5/2009 9:07:41 AM
John Leckey
General
Chamber Testing
Leia Run Log
738
10/2/2009 7:59:12 PM
David Armstrong
General
Chamber Testing
A run plan/wish list
Here are some (ambituous) thoughts for
the next couple of weeks:
Goals for VDC testing
737
10/2/2009 2:07:40 PM
John Leckey
General
Chamber Testing
Leia's 1st Drift Time Spectrum
Here is the 1st drift time spectrum from
Leia. It has poor statistics but more
data is being collected. The shape
736
10/2/2009 2:02:09 PM
John Leckey
Components
General
MAD Power
For future reference on the MAD cards:
Red wire = +6 Power
Green = Supply Ground
735
10/2/2009 9:16:53 AM
David Armstrong
General
Chamber Conditioning
Leia: conditioning history
[H3]Leia: History of voltage conditioning[/H3]
Notes: trip point initially set on 1 muA
734
9/29/2009 11:42:15 AM
John Leckey
General
Chamber Testing
Leia is Alive!!
Leia is currently at 3800 V and drawing
200 nA current and falling. There were
no troubles conditioning and it only took
733
9/28/2009 8:52:29 AM
David Armstrong
General
Chamber Construction
2nd chamber (Leia) under gas
The second chamber (Leia) has been
assembled; John, Ryan and Siyuan bolted it
together on Saturday. Gas (Ar/Ethane 65/35)
732
9/25/2009 4:12:42 PM
David Armstrong
General
Chamber Construction
Status update
A quick update (since nobody seems to be
writing things in the logbook):
731
9/9/2009 2:30:14 PM
Jeong Han Lee
General
Chamber Testing
Quick look at some more F1TDC data
According to the F1 tdc configuration, the
resolution (bin size) is [B]0.1132[/B] ns
and the rollover count is [B]64495[/B].
730
9/9/2009 2:30:14 PM
David Armstrong
General
Chamber Testing
Quick look at some more F1TDC data
Here is a typical time spectrum for a wire
of the first VDC (Vader). This was from Run
1376.
729
9/7/2009 3:00:38 PM
John Leckey
Components
Alu Cover Plate
Side Plate Drawings
I have designed the side plate to mate
the z-plates with the chamber aluminum plates.
I am using the 0.75" Al we already own
728
8/31/2009 4:18:15 PM
joshua
Drawings
Rotor
rotor assy drawings final
In response to John's worry about the length
of the load. Here is the drawing that
was sent to Mike to be made.
727
8/28/2009 3:23:25 PM
David Armstrong
General
Chamber Testing
update on F1TDC decoding
Update:
Josh and Jeong Han have modified xTychoAnalysis
726
8/28/2009 9:33:19 AM
David Armstrong
General
Chamber Testing
Decoded F1TDC results
[H2]First results from F1TDC run[/H2]
I have used Jeong Han & Josh's code "xTychoAnalysis"
725
8/26/2009 12:53:49 PM
John Leckey
General
Chamber Testing
F1 Run Log
Run Chamber Threshold Trigger Conditions
Voltage(V) (V)
724
8/21/2009 6:11:21 PM
joshua
Drawings
rotor
Load Drawings
title is self expanitory.
Josh
Goto page 1,
2
,
3
...
35
,
36
,
37
Next
ELOG V2.7.5-2130