Welcome Page Qweak
Region 3 Drift Chambers
Construction Software DAQ Internal Physics
  Development and Construction related Topics  Not logged in Qweak
Entry Klaus Grimm; B&L machined parts (pictures 01-29-2007)
   Reply Klaus Grimm; B&L machined parts (pictures 02-19-2007)
      Reply Klaus Grimm; B&L machined parts (pictures 06-15-2007)
         Reply Klaus Grimm; B&L machined parts at JLab (pictures 06-27-2007)
Message ID: 381     Entry time: 02/14/2007 03:11:53 PM     In reply to: 375     Reply to this: 433
 Author: Klaus Grimm 
 Type: Components 
 Category: Rotator 
 Subject: B&L machined parts (pictures 02-19-2007) 
 Record date: 02/29/2007 07:26:04 PM 
Paulo Medeiros and I visited B&L on Feb 19. They started to weld the struts to the half rings.
According to Gilbert Lozano (President of B&L) the V-grooves will be machined into the *assembled* rotator.
Before Gilbert was considering of machining the half rings as individual parts which would requirer a much higher precision. This part of machining will be outsourced to an external company which does the he dimensional metrology and quality control of the rotator.

.
Attachment 1: P2080005.JPG  711 kB  | Hide | Hide all
P2080005.JPG
Attachment 2: P2080006.JPG  752 kB  | Hide | Hide all
P2080006.JPG
Attachment 3: P2080007.JPG  758 kB  | Hide | Hide all
P2080007.JPG
Attachment 4: P2080009.JPG  730 kB  | Hide | Hide all
P2080009.JPG
ELOG V2.6.0-beta