|
Welcome Page
Qweak
|
|
Region 3 Drift Chambers
|
|
Construction
Software
DAQ
Internal
Physics
|
|
|
| Development and Construction related Topics |
Not logged in |
 |
|
|
|
|
Message ID: 381
Entry time: 02/14/2007 03:11:53 PM
In reply to: 375
Reply to this: 433
|
|
|
Paulo Medeiros and I visited B&L on Feb 19. They started to weld the struts to the half rings.
According to Gilbert Lozano (President of B&L) the V-grooves will be machined into the *assembled* rotator.
Before Gilbert was considering of machining the half rings as individual parts which would requirer a much higher precision. This part of machining will be outsourced to an external company which does the he dimensional metrology and quality control of the rotator.
. |
|
|
|
|
|
|
|
|